
Mr. Bharat Goyal
P.G.Department of Mathematics
Assistant Professor
M.Sc.(Mathematics), Ph.D.
Experience:10 Years
Publication and Activity Details
Journal Publications
- Bharat Goyal,(2024),FLOW SHOP SCHEDULING UNDER FUZZY ENVIRONMENT WITH RANDOM PROCESSING TIMES FOR MINIMUM SUM OF WAITING TIME OF JOBS,Industrial Engineering Journal,Vol.17(9),PP.10-16
- Bharat Goyal,(2024),A HEURISTIC APPROACH TO MINIMIZING THE WAITING TIME OF JOBS IN TWO STAGE FLOW SHOP SCHEDULING,Operations Research and Decisions,Vol.34(1),PP.175-191
- Bharat Goyal,(2024),Novel heuristic approach to minimize total waiting time of jobs in two stage flow shop scheduling,AIP Conference proceedings,Vol.2962,PP.1-11
- Bharat Goyal,(2022),Flow shop scheduling – especially structured models under fuzzy environment with optimal waiting time of jobs ,INTERNATIONAL JOURNAL OF DESIGN ENGNEERING,Vol.11 (1),PP.47-60
- Bharat Goyal,(2020),Minimizing waiting time of jobs in flow shop scheduling: a Heuristic Approach,Materials Today: proceedings,Vol.-,PP.-
- Bharat Goyal,(2020),SPECIAL STRUCTURES IN FLOWSHOP SCHEDULING WITH SEPARATED SET-UP TIMES AND CONCEPT OF JOB BLOCK: MINIMIZATION OF WAITING TIME OF JOBS,Advances in Mathematics: Scientific Journal,Vol.9(7),PP.4607-4619
- Bharat Goyal,(2018),Optimization of Total Waiting Time of Jobs in Two Stage Specially Structured Flow Shop Scheduling Model with Transportation Time of Jobs,International Journal on Future Revolution in Computer Science & Communication Engineering,Vol.4(3),PP.275-279
- Bharat Goyal,(2018),Specially Structured Flow Shop Scheduling in Two Stage with Concept of Job Block and Transportation Time to Optimize Total Waiting Time of Jobs,International Journal of Engineering and Technology (IJET) ,Vol.10(5),PP.1273-1284
- Bharat Goyal,(2018),TWO STAGE SPECIALLY STRUCTURED FLOW SHOP SCHEDULING INCLUDING TRANSPORTATION TIME OF JOBS AND PROBABILITIES ASSOCIATED WITH PROCESSING TIMES TO MINIMIZE TOTAL WAITING TIME OF JOBS,Journal of Emerging Technologies and Innovative Research (JETIR),Vol.5(6),PP.431-439
- Bharat Goyal,(2017),Minimization of Total Waiting Time in Specially Structured Flow Shop Scheduling under Fuzzy Environment with Separated Set up Times,International Journal on Future Revolution in Computer Science and Communication Engineering,Vol.3(8),PP.215-225
- Bharat Goyal,(2017),Minimization of total waiting time of jobs in n×2 specially structured Flow Shop Scheduling with set up time separated from processing time and each associated with probabilities,International Journal Of Engineering Research And Application,Vol.7(6),PP.27-33
- Bharat Goyal,(2017),Optimal Specially Structured n x 2 Flow Shop Scheduling to minimize total waiting time of jobs including job block concept with processing time separated from set up time ,International Journal on Recent and Innovation Trends in Computing and Communication,Vol.5(6),PP.727-732
- Bharat Goyal,(2016),Minimizing total waiting time of jobs in specially structured two stage Flow Shop Scheduling processing time separated from set up time,Journal Of Mathematics & Systems Sciences,Vol.12 (1-2),PP.73-75(a), 75(b)-76
- Bharat Goyal,(2016),Job block concept in two stage specially structured Flow shop scheduling to minimize the total waiting time of jobs ,International Journal of Latest Trends In Engineering and Technology,Vol.7(3),PP.287-295
- Bharat Goyal,(2016),Optimal scheduling for total waiting time of jobs in specially structured two stage Flow Shop Scheduling with processing times associated with probabilities,Aryabhatta Journal of Mathematics and Informatics,Vol.8(1),PP.45-52
- Bharat Goyal,(2015),Addition of two dimensional random variables using continuous distributions.,Mathematical Sciences International Research Journal,Vol.Volume 4,PP.233-236
- Bharat Goyal,(2015),Coefficient Inequality For a combined subclasses of starlike and inverse starlike classes of analytic functions,Mathematical Sciences International Research Journal,Vol.4,PP.224-227
Books Published
- Bharat Goyal,(2020),n x 2 Flow Shop Scheduling,Mauritius,Lambert Academic Publishing
- Bharat Goyal,(2020),Waiting Time of Jobs Models in n x 2 Flow Shop Scheduling,Mauritius,Lap Lambert academic Publishing
- Bharat Goyal,(2020),Parameters in 2 stage Flow Shop Scheduling Models,Mauritius,Lap Lambert academic Publishing
- Bharat Goyal,(2013),Differential Equations and Co-ordinate Geometry,Jalandhar,Dinesh Publications
- Bharat Goyal,(2013),DISCRETE MATHEMATICS,Jalandhar,Dinesh Publications
- Bharat Goyal,(2012),DIFFERENTIAL MANIFOLDS,Jalandhar,Sharma Publications
Chapter in Books
- Bharat Goyal,(2023),Comparative Performance Analysis of Heuristics with Bicriterion Optimization for Flow Shop Scheduling,Lecture Notes in Networks and Systems,653-670,Springer Nature Singapore Pte Ltd.
- Bharat Goyal,(2021),Specially Structured Flow Shop Scheduling Models with Processing Times as Trapezoidal Fuzzy Numbers to Optimize Waiting Time of Jobs,Soft Computing for Problem Solving, Advances in Intelligent Systems and Computing 1393,27-42,Springer Nature SIngapore
Conferences
- Bharat Goyal,(2022,26-11-2022),Novel Heuristic Approach to minimize total waiting time of jobs in two stage Flow Shop Scheduling,International Conference on Advances in Material Science And Technology (ICAMST-2022),Lovely Professional University, Punjab
- Bharat Goyal,(2019,07-06-2019),Specially Structured Flow Shop Scheduling in Two Stage with separated set up time associated with probabilities and concept of job block to optimize total of the waiting time of jobs,ICFMST-2019,University Institute of Sciences, Chandigarh University/ University of Mauritius, Mauritius/Concordia University, Canada
- Bharat Goyal,(2018,17-02-2018),Optimization of Total Waiting Time of Jobs in Two Stage Specially Structured Flow Shop Scheduling Model with Transportation Time of Jobs,ICETEST-2018,Maharishi Markandehwar Engineering College, Mullana, Ambala, India
- Bharat Goyal,(2015,19-03-2015),Addition of two dimensional random variables using continuous distributions,ICAMS-2015,GSSDGS Khalsa College Patiala
Seminar
Projects
- Bharat Goyal,(2018), Minor project on Optimization of Total Waiting Time of Jobs in Two Stage Flow Shop Scheduling ,under Khalsa College Patiala under CPE-UGC Scheme fro Faculty Enrichment
Awards
- Bharat Goyal,(2018), Shreshtha Acharya Award ,award from Manav Kalyan Parishad Punjab,National
Refresher
- Bharat Goyal,(2018,21 days,01/12/2018), Refresher Course in Research Methodology,UGC-HRDC
Orientation
- Bharat Goyal,(2018,28 days,01/05/2018), Orientation Course,UGC-HRDC
Workshop
- Bharat Goyal,(2021,1 week,13/09/2021), One Week Workshop on Research Methodology & Research Ethics ,Research and IPR Cell Khalsa College Patiala
Seminar
Winter School
Faculty Development Programme
Short Term Course
Camps Attended
Video Lectures By Mr. Bharat Goyal
About Khalsa College Patiala
Khalsa College, Patiala is one of the renowned institute in the state of Punjab. It has carved its niche in providing holistic education to students to enable them to confront myriad challenges in the various walks of life.
How to Reach Us ?
Badungar Road
Near Rajindra Hospital,
Patiala-147001
0175-2215835
Our Facebook Page
© All Rights Reserved by Khalsa College Patiala.Developed By Gurpal Singh